- #01Asbestos / lead paint assessmentLife Safety
Pre-demolition asbestos survey required by federal NESHAP for most structures; lead paint RRP applies to pre-1978.
40 CFR 61 Subpart M40 CFR 745FBC-B 107.3.5 - #02Adjacent unit protection (MF-specific)Life Safety
Demolition of one unit in a multi-family structure must protect adjacent units from structural, fire, and environmental impact.
FBC-EB 1401 - #03Utility disconnect coordinationLife Safety
Utility disconnects (water, sewer, gas, electric) must be coordinated with utility providers.
Local demolition standards
Multi Family Demolition
Demolition of an existing apartment building or condo complex
Last updated: Apr 20, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Demolition Plan or Detailed Scope of WorkDemolition plan or detailed written scope of work describing all demolition activities
- Site Plan / SurveySite plan or survey showing structures to be demolished and surrounding features
Conditional
- Asbestos SurveyAsbestos survey guidance based on year built and risk; verify requirement during downstream review as needed.WhenGuidance only (non-blocking at intake): may be required depending on year built and asbestos risk factors.
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingRequired
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Building
Final Building
RequiredTypical Final- Structure fully demolishedCritical
Verify permitted structure is completely demolished and removed from site
FBC-B 110.3 - Utility disconnectionCritical
Verify all utilities (electric, gas, water, sewer) are properly disconnected and capped
FBC-B 3303.5 - Site conditionCritical
Verify site is graded, debris is removed, and no hazardous materials remain
FBC-B 3303.3 - Erosion control
Verify erosion control measures are in place if required
FBC-B 3303.2