- #01Design wind speed & exposureLife Safety
Structural drawings must declare design wind speed (Vult) and exposure category matching the jurisdiction's wind speed map.
FBC-R R301.2.1ASCE 7-22 - #02Pool barrier compliance (if applicable)Life Safety
If fence encloses a pool, must meet ISPSC/FBC-R pool barrier requirements.
FBC-R R4501.17ISPSC 305 - #03Engineer of record sealDocumentation
Structural drawings must bear a current Florida-licensed engineer's seal and signature.
Florida Statutes Chapter 471FBC-B 107.3.5
Multi Family
Multi Family Fence
Gate
Last updated: Apr 20, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Site PlanSite plan showing fence location, height, and relationship to property boundaries
- Product SpecificationsProduct specifications for fence materials and design
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingRequired
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Building
Phase #1
Final Building
RequiredTypical Final- Post installation and depthCritical
Verify fence posts are set at proper depth and spacing per approved plans
FBC-R R301.1 - Fence height and setbackCritical
Verify fence height and setback from property line per approved plans
FBC-R R301.1 - Material and constructionCritical
Verify fence material and construction method match approved plans
FBC-R R301.1 - Gate operation
Verify gates open, close, and latch properly
FBC-R R301.1