- #01Generator disconnect, transfer switch, and labelingLife Safety
Standby generator installation requires approved transfer switch, disconnect, and required labeling per NEC 702 / 445.
NEC 445NEC 702NEC 230.82 - #02Grounding and bondingLife Safety
Grounding electrode, equipment grounding, and bonding per NEC Article 250.
NEC 250 - #03Plan review applicability (FBC 107.3.5 minimum criteria)Documentation
Standby/emergency systems fall under NEC 702 compliance. FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
Multi Family Generator Install
Last updated: Apr 20, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Equipment SpecificationsManufacturer specifications for the generator including capacity, fuel type, and output rating
- Electrical Load CalculationsElectrical load calculations showing generator capacity relative to the loads it will serve
- Site PlanSite plan showing generator placement, clearances, and fuel supply routing
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
ElectricalAdvisory
Items marked Advisory are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Electrical
Rough Electrical
Required- Generator pad and placementCritical
Verify generator is placed on approved pad with required clearances from structure, openings, and property lines
NEC 445.10FBC-M 304.1 - Electrical connection and transfer switchCritical
Verify transfer switch installation, wire sizing, and connection to main panel per plans
NEC 702.4NEC 445.13 - Fuel line installationCritical
Verify gas line sizing, routing, and connections per plans (if natural gas/propane)
FBC-FG 401.1 - GroundingCritical
Verify generator grounding per NEC requirements
NEC 250.34
Final Electrical
RequiredTypical Final- Generator operational testCritical
Verify generator starts, runs, and transfers load properly
NEC 702.4 - Transfer switch operationCritical
Verify automatic transfer switch engages and disengages properly
NEC 702.4 - Labeling and signageCritical
Verify all required labels at generator, transfer switch, and main panel
NEC 702.7NEC 445.11 - Sound and vibration
Verify generator meets any local noise ordinance requirements
FBC-B 110.3