- #01Water heater installation requirementsCode
Replacement water heater installation must include T&P valve, expansion control, drain pan, and proper combustion air / venting for fuel-fired units.
FBC-P 504FBC-M 303FBC-FG - #02Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, plan review is not required for replacing existing equipment (Exemption #1). FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
Multi Family Hot Water Heater Changeout
Replacement of existing water heater with like-for-like or upgraded unit
Last updated: Apr 21, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Equipment SpecificationsManufacturer specifications for the replacement water heater including capacity, fuel type, and input rating
- AHRI Certification SheetAHRI performance certification showing Uniform Energy Factor (UEF) rating for the replacement water heater
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
PlumbingAdvisory
Items marked Advisory are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Plumbing
Rough Plumbing
Required- Water heater specificationsCritical
Verify new water heater model, capacity, and energy rating match approved plans
FBC-P 607.1 - TPR valve and discharge pipeCritical
Verify temperature and pressure relief valve is installed with proper discharge pipe to approved termination
FBC-P 607.5 - Drain pan and drain lineCritical
Verify drain pan is installed under unit with drain line routed to approved location
FBC-P 607.4 - Supply connectionsCritical
Verify hot and cold water connections are properly made with no leaks
FBC-P 607.1
Final Plumbing
RequiredTypical Final- Operational testCritical
Verify water heater heats water and all fixtures receive hot water
FBC-P 607.1 - No visible leaksCritical
Verify no leaks at any connection point
FBC-P 312.1 - Seismic strapping (if required)
Verify strapping is installed where required
FBC-P 607.1