- #01Pool barrier (MF)Life Safety
Multi-family pool barrier per FBC-R R4501.17 / ISPSC 305.
FBC-R R4501.17ISPSC 305 - #02Design wind speed & exposureLife Safety
Structural drawings must declare design wind speed (Vult) and exposure category matching the jurisdiction's wind speed map.
FBC-R R301.2.1ASCE 7-22 - #03Engineer of record sealDocumentation
Structural drawings must bear a current Florida-licensed engineer's seal and signature.
Florida Statutes Chapter 471FBC-B 107.3.5
Multi Family Pool Construction
Last updated: Apr 20, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Construction Plans Sealed by a Florida Registered Design ProfessionalPool construction plans showing layout, dimensions, structural details, plumbing, and electrical
- TDH CalculationsTurnover, Design, and Hydraulic (TDH) calculations for the pool system
- Equipment SpecificationsManufacturer specifications for pump, filter, heater, and other pool equipment
- Site Plan / SurveySite plan or survey showing pool location, setbacks, and safety barrier locations
Conditional
- Safety Barrier AffidavitSigned affidavit confirming pool safety barrier and alarm compliance when those details are not shown in sealed construction plans.WhenRequired only if sealed construction plans do not clearly specify pool safety barrier and alarm details.
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingRequired
ElectricalRequired
- #01Equipotential bonding (MF pool)Life Safety
MF pool equipotential bonding grid per NEC 680.26.
NEC 680.26 - #02GFCI / luminaires (MF pool)Life Safety
Pool circuits per NEC 680 (GFCI, underwater luminaires, motor disconnects).
NEC 680
PlumbingRequired
- #01Suction entrapment / VGBA (MF pool)Life Safety
MF pool VGBA compliance.
VGBAISPSC 310
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Building
Footing, Slab, UFER
Required- Rebar grid spacing and sizeCritical
Verify rebar size and spacing match approved plans
ISPSC 307.2FBC-R R506.2.4 - Pool excavation and formworkCritical
Verify pool shape, dimensions, and formwork match approved plans
ISPSC 307.2.1 - Pool depth verificationCritical
Confirm pool depth matches approved plans at shallow and deep ends
ISPSC 307.2 - Bonding grid perimeter wireCritical
Verify copper bonding wire is installed around pool perimeter per NEC
NEC 680.26 - Bonding grid to pool steel connectionsCritical
Verify bonding wire is connected to pool steel reinforcement
NEC 680.26(B) - Bonding of metallic components within 5 feetCritical
Verify all metallic components within 5 feet of pool edge are bonded
NEC 680.26(B) - Deck reinforcement layoutCritical
Verify deck rebar spacing, overlap, and placement per plans
ISPSC 306.1FBC-R R506.2.4 - Deck bonding wireCritical
Verify bonding wire is attached to reinforcement steel in deck area
NEC 680.26(B) - Plumbing and electrical conduit in place
Verify plumbing lines and electrical conduit are installed prior to pour
FBC-B 110.3
Plumbing
Underground Plumbing
Required- Pipe installation and supportCritical
Verify plumbing lines are properly installed and supported per plans
FBC-P 305.1 - Burial depthCritical
Verify underground pipe burial depth meets code minimum
FBC-P 305.5 - Pressure testCritical
Verify plumbing system holds required pressure test
FBC-P 312.2 - Distance from pool edgeCritical
Verify plumbing lines maintain required distance from pool edge per code
ISPSC 307.2 - Pipe sizing per plans
Verify pipe sizes match approved plans
FBC-P 604.1
Electrical
Underground Electrical
Required- Conduit and wiring installationCritical
Verify electrical conduit and wiring are properly installed per plans
NEC 680.11 - Burial depth verificationCritical
Verify conduit burial depth meets minimum code requirements
NEC 680.11(A) - Distance from pool edgeCritical
Verify electrical lines maintain required distance from pool edge
NEC 680.11 - Bonding connections at undergroundCritical
Verify bonding continuity at all underground electrical connections
NEC 680.26
Plumbing
Rough Plumbing
Required- Deck drain installationCritical
Verify deck drains are installed with proper slope away from pool
ISPSC 306.5.1 - Equipment pad plumbing connectionsCritical
Verify plumbing connections at pump, filter, and heater locations
ISPSC 308 - Suction outlet complianceCritical
Verify suction outlets meet entrapment avoidance requirements
ISPSC 307.1 - Deck slope and drainage direction
Verify deck slopes drain away from pool or toward deck drains
ISPSC 306.5
Electrical
Rough Electrical
Required- Equipment wiringCritical
Verify electrical wiring to pump, filter, heater per plans
NEC 680.21 - GFCI protectionCritical
Verify GFCI-protected outlets and circuits in pool area
NEC 680.22 - Receptacle locations and distancesCritical
Verify receptacle placement meets minimum distance requirements from pool
NEC 680.22(A) - Equipment bondingCritical
Verify bonding wire connections at all pool equipment
NEC 680.26(B)
Building
Final Building
RequiredTypical Final- Overall pool constructionCritical
Verify completed pool including decking matches approved plans
ISPSC 307.2 - Barrier heightCritical
Verify barrier is minimum 48 inches above grade on outside face
ISPSC 305.2.1 - Gate latch heightCritical
Verify gate latch release mechanism is at 54 inches from grade on pool side
ISPSC 305.3.3 - Gate self-closing and self-latchingCritical
Verify gates are self-closing and self-latching
ISPSC 305.3 - Barrier openingsCritical
Verify no opening in barrier allows passage of 4-inch sphere
ISPSC 305.2.2 - Deck condition and edges
Verify deck surface is slip-resistant with radiused edges
ISPSC 306.2ISPSC 306.8 - Equipment labels visible
Verify visible equipment labels on pumps, filters, heaters
FBC-B 110.3 - Emergency shut-off switch
Verify emergency shut-off switch is installed where required
NEC 680.12 - Pool alarm / dwelling-wall protection (R4501.17.1.9)Critical
Where any wall of the dwelling forms part of the pool barrier, verify ONE of three compliance methods is installed: exit alarms on all direct-access doors/windows, self-closing self-latching devices on all direct-access doors, or a certified in-pool alarm. Confirm method matches what was specified on approved plans. Skip if entire barrier is freestanding fence/screen with no dwelling wall participation.
FBC-R R4501.17.1.9
Electrical
Final Electrical
RequiredTypical Final- Pool light installationCritical
Verify pool lights are properly installed per plans and NEC
NEC 680.23 - Equipotential bonding completeCritical
Verify bonding of all required metallic components within 5 feet of pool
NEC 680.26(B) - GFCI protection operationalCritical
Verify all required circuits in pool area have GFCI protection and test
NEC 680.22 - Grounding connectionsCritical
Verify grounding connections at all pool equipment
NEC 680.25 - Disconnect switchCritical
Verify equipment disconnect switch is accessible and properly rated
NEC 680.12
Plumbing
Final Plumbing
RequiredTypical Final- Pump and filter operationCritical
Verify pump and filter are operational and properly installed
ISPSC 308 - Drain covers and suction safetyCritical
Verify main drain covers are compliant and properly secured
ISPSC 307.1 - Skimmer installation
Verify skimmers are properly installed and functional
ISPSC 307.2 - Heater installation
If heater present, verify installation per manufacturer specs
ISPSC 303.1.1 - Backflow preventionCritical
Verify backflow prevention device is installed on water supply
FBC-P 608.1