- #01Design wind speed & exposureLife Safety
Structural drawings must declare design wind speed (Vult) and exposure category matching the jurisdiction's wind speed map.
FBC-R R301.2.1ASCE 7-22 - #02Egress from sleeping roomsLife Safety
Each sleeping room must have an emergency escape and rescue opening meeting R310 dimensions.
FBC-R R310 - #03Smoke and CO alarm coverageLife Safety
Smoke alarms in each sleeping room, outside each sleeping area, and on each story. CO alarms where fuel-fired appliances or attached garages exist.
FBC-R R314FBC-R R315 - #04Structural wall section and load pathLife Safety
A continuous wall section from foundation through roof must show framing, sheathing, connectors, and uplift resistance.
FBC-R R301FBC-R R602FBC-R R802 - #05Fire-rated unit separationLife Safety
Dwelling-unit and corridor separations must maintain the original fire-resistance rating through any new work.
FBC-B 420FBC-B 711FBC-B 708 - #06Florida product approvalCode
Florida product approval (FL#) or Miami-Dade NOA must be listed for regulated products (fenestration, structural panels, covering systems).
FBC-B 1708FBC-R R301.2.1.2
New Condo
Individual units at a single address which are deeded for individual ownership
Last updated: Apr 22, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Construction Plans Sealed by a Florida Registered Design ProfessionalConstruction plans sealed by a Florida-registered design professional (architect or engineer)
- Energy Compliance FormsEnergy compliance documentation per FBC Chapter 13 / IECC
- Product ApprovalsFlorida Product Approvals for windows, doors, roofing materials, and other regulated components
- Site Plan / SurveyCurrent site plan or survey showing property boundaries, setbacks, and building footprint
Conditional
- Truss Engineering & Layout OR Truss Deferral AffidavitTruss engineering package, conventional framing per FBC, or a truss deferral letter requesting deferred submittal of truss engineering.WhenRequired only when structure uses pre-engineered trusses and truss engineering is not shown in the sealed plan set; satisfied by truss engineering in plan set OR conventional framing per FBC OR a truss deferral letter.
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingRequired
MechanicalRequired
- #01Combustion air and ventingLife Safety
Fuel-fired equipment requires combustion air and proper venting per FBC-M 303 / 804.
FBC-M 303FBC-M 804FBC-FG - #02Manual J / S / D load calculationPerformance
HVAC equipment sizing per Manual J; selection per Manual S; duct design per Manual D.
FBC-R M1401.3FBC-M 309 - #03VentilationPerformance
Whole-house or occupancy-based ventilation per FBC-R M1507 / FBC-M 403.
FBC-R M1507FBC-M 403
ElectricalRequired
- #01AFCI and GFCI protectionLife Safety
AFCI protection for dwelling unit branch circuits per NEC 210.12; GFCI per NEC 210.8 at required locations.
NEC 210.8NEC 210.12 - #02Grounding and bondingLife Safety
Grounding electrode, equipment grounding, and bonding per NEC Article 250.
NEC 250 - #03Service size and load calculationCode
Electrical service and feeder sizing supported by NEC Article 220 load calculation.
NEC 220NEC 230
PlumbingRequired
- #01Water service and DWV sizingCode
Water service line sizing and DWV sizing consistent with fixture unit count.
FBC-P 604FBC-P 709FBC-P 906 - #02Backflow preventionCode
Backflow prevention required at well, irrigation, or other cross-connections per FBC-P 608.
FBC-P 608
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Plumbing
Underground Plumbing
Required- Pipe material and sizingCritical
Verify pipe material and sizes match approved plans
FBC-P 604.1FBC-P 305.1 - Burial depthCritical
Verify underground pipe burial depth meets code minimum
FBC-P 305.5 - Pipe slope and supportCritical
Verify proper slope on drain lines and adequate support
FBC-P 704.1 - Pressure testCritical
Verify plumbing system holds required pressure test
FBC-P 312.2 - Cleanout locations
Verify cleanout access points are installed per plans
FBC-P 708.1
Electrical
Underground Electrical
Conditional- Conduit installationCritical
Verify conduit material, size, and routing per plans
NEC 300.5 - Burial depthCritical
Verify conduit burial depth meets code minimum
NEC 300.5 - UFER ground connectionCritical
Verify UFER grounding electrode is properly connected to rebar in footing
NEC 250.52(A)(3) - Conduit protection
Verify conduit is protected from damage where exposed
NEC 300.5(D)
Building
Footing, Slab, UFER
Required- Footing dimensionsCritical
Verify footing width and depth match approved plans
FBC-R R403.1FBC-R R403.1.1 - Rebar size and spacingCritical
Verify rebar size, spacing, and placement per plans
FBC-R R403.1 - UFER grounding electrodeCritical
Verify minimum 20 feet of #4 bare copper or rebar is encased in footing
NEC 250.52(A)(3) - Slab vapor barrierCritical
Verify vapor barrier is installed under slab per plans
FBC-R R506.2.3 - Slab thickness and wire meshCritical
Verify slab thickness and reinforcement per plans
FBC-R R506.1 - Foundation anchorage layout
Verify anchor bolt placement for sill plate attachment
FBC-R R403.1.6
Fill Cell, Tie Beam, Lintel
Conditional- Cell fill and groutCritical
Verify cells are properly grouted per plans
FBC-R R609.1.1 - Tie beam reinforcementCritical
Verify tie beam rebar size, spacing, and lap splices per plans
FBC-R R609.1 - Lintel reinforcementCritical
Verify lintel rebar and sizing over openings per plans
FBC-R R609.7 - Vertical rebar placementCritical
Verify vertical rebar is properly placed and spaced in block wall
FBC-R R609.1
Rough Framing
Required- Wall stud spacing and sizeCritical
Verify stud size and spacing match approved plans
FBC-R R602.3FBC-R R602.3.1 - Headers and beamsCritical
Verify header and beam sizes over openings per plans
FBC-R R602.7 - Top and bottom plate connectionsCritical
Verify double top plates with proper lapping and anchored bottom plates
FBC-R R602.3.2 - Corner and intersection bracingCritical
Verify proper bracing at corners and wall intersections
FBC-R R602.10 - Window and door rough openingsCritical
Verify rough openings match approved plans for size and location
FBC-R R602.7 - Hurricane straps and hold-downsCritical
Verify hurricane straps and hold-down hardware installed per plans
FBC-R R802.11 - Fire blocking
Verify fire blocking is installed at required locations
FBC-R R602.8 - Fire separation wall framingCritical
Verify party/fire wall is framed continuously from foundation to underside of roof sheathing per plans
FBC-R R302.1FBC-R R302.2 - Draft stopping in party wallCritical
Verify draft stopping is installed in concealed spaces of the fire separation wall
FBC-R R302.4
Roof Sheathing
Conditional- Roof sheathing attachmentCritical
Verify roof deck nailing pattern and edge spacing per the approved nailing schedule.
FBC-R R803.2FBC-R R802.11 - Roof sheathing material and thicknessCritical
Verify roof sheathing panel material, thickness, and span rating match the approved plans.
FBC-R R803.1 - Panel gap spacing at roof deck
Verify proper edge gap between roof sheathing panels per the panel manufacturer.
FBC-R R803.2
Wall Sheathing
Conditional- Wall sheathing attachmentCritical
Verify wall sheathing nailing pattern and edge spacing per the approved nailing schedule (shear wall zones often require tighter spacing).
FBC-R R602.3 - Wall sheathing material and thicknessCritical
Verify wall sheathing panel material, thickness, and grade stamp match the approved plans.
FBC-R R602.3 - Panel gap spacing at walls
Verify proper edge gap between wall sheathing panels per the panel manufacturer.
FBC-R R602.3
Truss Tie Down and Engineering
Required- Truss spacing and alignmentCritical
Verify truss spacing and alignment match approved plans
FBC-R R802.10 - Truss-to-wall connectionCritical
Verify hurricane clips or straps at every truss-to-wall connection
FBC-R R802.11 - Truss bracingCritical
Verify lateral and diagonal bracing is installed per truss engineering
FBC-R R802.10.3 - Truss engineering on siteCritical
Verify sealed truss engineering package is available and matches installed trusses
FBC-R R802.10.1 - Gable end bracing
Verify gable end trusses are properly braced
FBC-R R802.10.3
Roof Dry In, In Progress
Required- Underlayment installationCritical
Verify roof underlayment is installed per code and manufacturer specs
FBC-R R905.1.1 - Drip edge installationCritical
Verify drip edge is installed at eaves and rakes
FBC-R R905.2.8.5 - Valley and flashingCritical
Verify valley flashing and wall flashing are properly installed
FBC-R R903.2 - Roof penetration sealing
Verify all roof penetrations are properly sealed and flashed
FBC-R R903.2
Plumbing
Rough Plumbing
Required- Supply pipe sizing and materialCritical
Verify supply pipe sizes and material match approved plans
FBC-P 604.1 - DWV pipe sizing and slopeCritical
Verify drain, waste, and vent pipe sizes and slope per plans
FBC-P 704.1 - Pipe support and hangingCritical
Verify pipes are properly supported at required intervals
FBC-P 308.1 - Vent termination locations
Verify vent pipes terminate properly through roof
FBC-P 903.1 - Water heater rough-in
Verify water heater location, drain pan, and connections per plans
FBC-P 607.1
Electrical
Rough Electrical
Required- Panel installationCritical
Verify electrical panel is properly mounted and sized per plans
NEC 408.4 - Wire sizing per circuitsCritical
Verify wire gauge matches breaker amperage for each circuit
NEC 210.3NEC 240.4 - Box fill and installationCritical
Verify electrical boxes are properly installed and not overfilled
NEC 314.16 - GFCI and AFCI locationsCritical
Verify GFCI and AFCI protection is provided where required
NEC 210.8NEC 210.12 - Smoke and CO alarm wiringCritical
Verify interconnected smoke and CO alarm wiring is in place
FBC-R R314.3FBC-R R315 - Grounding and bondingCritical
Verify grounding electrode system and bonding connections
NEC 250.50
Mechanical
Rough Mechanical/HVAC
Required- Ductwork installationCritical
Verify duct sizes, routing, and support match approved plans
FBC-M 603.1 - Duct sealingCritical
Verify duct joints and connections are properly sealed
FBC-M 603.9 - Equipment placementCritical
Verify air handler and condenser locations per plans with required clearances
FBC-M 304.1 - Refrigerant line installation
Verify refrigerant line sizing and insulation per plans
FBC-M 1101.3 - Return air pathway
Verify return air pathways are properly sized and located
FBC-M 601.2
Building
Insulation
Required- Wall cavity insulation R-valueCritical
Verify wall insulation R-value matches energy calculations
FBC-E R402.1 - Ceiling/attic insulation R-valueCritical
Verify ceiling or attic insulation R-value per energy calculations
FBC-E R402.1 - Insulation coverage and gapsCritical
Verify no gaps, voids, or compression in insulation installation
FBC-E R402.4 - Air sealing
Verify air sealing at penetrations, top plates, and rim joists
FBC-E R402.4.1
Lathe, Siding
Conditional- Wall covering material and installationCritical
Verify exterior wall covering material matches approved plans and is properly installed
FBC-R R703.1 - Weather-resistive barrierCritical
Verify weather-resistive barrier is properly installed behind cladding
FBC-R R703.2 - Flashing at penetrations and transitionsCritical
Verify flashing is installed at windows, doors, and wall transitions
FBC-R R703.4 - Fastener pattern and spacing
Verify cladding fastener type and spacing per manufacturer and plans
FBC-R R703.1
Drywall
ConditionalBD-DependentMost jurisdictions skip this inspection for this project type. Confirm with your building department whether they'll require it.
- Drywall thickness and typeCritical
Verify drywall thickness matches plans, moisture-resistant board in wet areas
FBC-R R702.3.1 - Fastener spacingCritical
Verify screw or nail spacing meets code requirements
FBC-R R702.3.5 - Fire-rated assembliesCritical
Verify fire-rated walls and ceilings have proper drywall layers per rating
FBC-R R302.6 - Moisture barrier in wet areas
Verify moisture barrier behind tub/shower surrounds where required
FBC-R R702.4 - Fire-rated party wall assemblyCritical
Verify party wall has required layers of Type X gypsum per fire rating (typically 1-hour)
FBC-R R302.1FBC-R R302.2 - Party wall penetration firestoppingCritical
Verify all penetrations through party wall are firestopped with approved materials
FBC-R R302.4
Electrical
Final Electrical
RequiredTypical Final- Panel complete and labeledCritical
Verify panel cover installed, all breakers labeled, no open knockouts
NEC 408.4 - GFCI and AFCI operationalCritical
Verify all GFCI and AFCI devices test and reset properly
NEC 210.8NEC 210.12 - Receptacle and switch functionCritical
Verify outlets and switches operate correctly throughout
NEC 210.52 - Light fixtures installed
Verify all light fixtures are installed and operational
NEC 210.70 - Exterior lighting and outletsCritical
Verify exterior outlets are GFCI protected and lighting is functional
NEC 210.8NEC 210.52(E)
Plumbing
Final Plumbing
RequiredTypical Final- Fixture installation and operationCritical
Verify all plumbing fixtures are installed, connected, and operational
FBC-P 405.1 - Water heater installationCritical
Verify water heater is properly installed with TPR valve, drain pan, and discharge pipe
FBC-P 607.1 - No visible leaksCritical
Verify no leaks at any supply or drain connection
FBC-P 312.1 - Hose bibbs and exterior plumbing
Verify exterior hose bibbs have backflow prevention
FBC-P 608.15.4.2
Mechanical
Final Mechanical/HVAC
RequiredTypical Final- System operational testCritical
Verify HVAC system starts, runs, and produces heated and cooled air
FBC-M 304.1 - Air handler and condenser installationCritical
Verify equipment is properly installed with required clearances and level
FBC-M 304.1 - Condensate drainCritical
Verify condensate drain is properly routed and terminated
FBC-M 307.2 - Duct registers and grilles
Verify all supply and return registers are installed and operational
FBC-M 601.2 - Equipment labels and data plates
Verify equipment nameplates match approved plans for capacity and efficiency
FBC-M 304.1
Building
Final Building
RequiredTypical Final- Egress doors and hardwareCritical
Verify egress doors provide minimum 32-inch clear width and proper hardware
FBC-R R311.2 - Smoke alarms installed and operationalCritical
Verify smoke alarms in each bedroom, outside sleeping areas, and each level
FBC-R R314.3 - CO alarms installedCritical
Verify carbon monoxide alarms where required
FBC-R R315 - Emergency escape openingsCritical
Verify bedroom windows meet egress size requirements
FBC-R R310.1 - Stairway complianceCritical
Verify stair rise, run, handrail height, and landing dimensions
FBC-R R311.7 - Party wall continuity and sealingCritical
Verify fire separation wall is complete with no unsealed penetrations, gaps, or breaches from foundation to roof
FBC-R R302.1FBC-R R302.2FBC-R R302.4 - Address numbers visible
Verify address numbers are posted and visible from street
FBC-R R319.1 - Exterior finishes complete
Verify exterior cladding, trim, and weatherproofing are complete
FBC-R R703.1 - Site grading and drainage
Verify finish grade slopes away from foundation minimum 6 inches in 10 feet
FBC-R R401.3