- #01Footing / foundation designLife Safety
Footing or foundation design must show dimensions, reinforcement, depth, and connection to the structure above.
FBC-R R403FBC-B 1809 - #02Attachment to existing structureLife Safety
Connection details between the new work and the existing structure must show fastener type, spacing, and embedment.
FBC-B 2002.5FBC-R R301.1 - #03Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, manufactured/modular building plans are exempt except for foundations and modifications (Exemption #6). FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
New Single Family Modular Home
Last updated: Apr 21, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Construction Plans Sealed by a Florida Registered Design Professional
- Energy Compliance Forms
- Product Approvals
- Site Plan / Survey
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingAdvisory
MechanicalAdvisory
- #01Combustion air and ventingLife Safety
Fuel-fired equipment requires combustion air and proper venting per FBC-M 303 / 804.
FBC-M 303FBC-M 804FBC-FG - #02Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, modular plans are exempt for factory-built systems. FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
ElectricalAdvisory
- #01Service size and load calculationCode
Electrical service and feeder sizing supported by NEC Article 220 load calculation.
NEC 220NEC 230 - #02Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, modular plans are exempt except for service connections. FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
Items marked Advisory are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Building
Footing, Slab, UFER
Required- Footing dimensionsCritical
Verify footing width and depth match approved plans
FBC-R R403.1FBC-R R403.1.1 - Rebar size and spacingCritical
Verify rebar size, spacing, and placement per plans
FBC-R R403.1 - UFER grounding electrodeCritical
Verify minimum 20 feet of #4 bare copper or rebar is encased in footing
NEC 250.52(A)(3) - Slab vapor barrierCritical
Verify vapor barrier is installed under slab per plans
FBC-R R506.2.3 - Slab thickness and wire meshCritical
Verify slab thickness and reinforcement per plans
FBC-R R506.1 - Foundation anchorage layout
Verify anchor bolt placement for sill plate attachment
FBC-R R403.1.6
Tie Down
Required- Anchor and strap installationCritical
Verify ground anchors and tie-down straps are installed per manufacturer specs and engineering
FBC-R R301.2.1FBC-B 3103.1 - Anchor spacing and countCritical
Verify number and spacing of anchors match tie-down engineering
FBC-R R301.2.1 - Strap tension and connectionCritical
Verify straps are properly tensioned and connected to frame rails
FBC-R R301.2.1 - Pier and pad conditionCritical
Verify piers and pads are properly placed and level under home
FBC-R R301.2.1
Electrical
Rough Electrical
Required- Panel installationCritical
Verify electrical panel is properly mounted and sized per plans
NEC 408.4 - Wire sizing per circuitsCritical
Verify wire gauge matches breaker amperage for each circuit
NEC 210.3NEC 240.4 - Box fill and installationCritical
Verify electrical boxes are properly installed and not overfilled
NEC 314.16 - GFCI and AFCI locationsCritical
Verify GFCI and AFCI protection is provided where required
NEC 210.8NEC 210.12 - Smoke and CO alarm wiringCritical
Verify interconnected smoke and CO alarm wiring is in place
FBC-R R314.3FBC-R R315 - Grounding and bondingCritical
Verify grounding electrode system and bonding connections
NEC 250.50
Mechanical
Rough Mechanical/HVAC
Required- Ductwork installationCritical
Verify duct sizes, routing, and support match approved plans
FBC-M 603.1 - Duct sealingCritical
Verify duct joints and connections are properly sealed
FBC-M 603.9 - Equipment placementCritical
Verify air handler and condenser locations per plans with required clearances
FBC-M 304.1 - Refrigerant line installation
Verify refrigerant line sizing and insulation per plans
FBC-M 1101.3 - Return air pathway
Verify return air pathways are properly sized and located
FBC-M 601.2
Electrical
Temporary Power
Conditional- Temporary power pole and meterCritical
Verify temporary power pole is properly set with meter base and disconnect
NEC 590.4 - Grounding electrodeCritical
Verify grounding rod is installed and connected to temporary panel
NEC 250.52 - GFCI protectionCritical
Verify all temporary receptacles have GFCI protection
NEC 590.6
Building
Soffit
Conditional- Soffit material and attachmentCritical
Verify soffit material matches approved plans and is properly attached
FBC-R R703.1 - Ventilation openingsCritical
Verify soffit ventilation openings are properly sized and screened
FBC-R R806.1 - Continuous coverage
Verify soffit is installed continuously with no gaps
FBC-R R703.1
Lathe, Siding
Conditional- Wall covering material and installationCritical
Verify exterior wall covering material matches approved plans and is properly installed
FBC-R R703.1 - Weather-resistive barrierCritical
Verify weather-resistive barrier is properly installed behind cladding
FBC-R R703.2 - Flashing at penetrations and transitionsCritical
Verify flashing is installed at windows, doors, and wall transitions
FBC-R R703.4 - Fastener pattern and spacing
Verify cladding fastener type and spacing per manufacturer and plans
FBC-R R703.1
Final Building
RequiredTypical Final- Egress doors and hardwareCritical
Verify egress doors provide minimum 32-inch clear width and proper hardware
FBC-R R311.2 - Smoke alarms installed and operationalCritical
Verify smoke alarms in each bedroom, outside sleeping areas, and each level
FBC-R R314.3 - CO alarms installedCritical
Verify carbon monoxide alarms where required
FBC-R R315 - Emergency escape openingsCritical
Verify bedroom windows meet egress size requirements
FBC-R R310.1 - Stairway complianceCritical
Verify stair rise, run, handrail height, and landing dimensions
FBC-R R311.7 - Address numbers visible
Verify address numbers are posted and visible from street
FBC-R R319.1 - Exterior finishes complete
Verify exterior cladding, trim, and weatherproofing are complete
FBC-R R703.1 - Site grading and drainage
Verify finish grade slopes away from foundation minimum 6 inches in 10 feet
FBC-R R401.3
Electrical
Final Electrical
RequiredTypical Final- Panel complete and labeledCritical
Verify panel cover installed, all breakers labeled, no open knockouts
NEC 408.4 - GFCI and AFCI operationalCritical
Verify all GFCI and AFCI devices test and reset properly
NEC 210.8NEC 210.12 - Receptacle and switch functionCritical
Verify outlets and switches operate correctly throughout
NEC 210.52 - Light fixtures installed
Verify all light fixtures are installed and operational
NEC 210.70 - Exterior lighting and outletsCritical
Verify exterior outlets are GFCI protected and lighting is functional
NEC 210.8NEC 210.52(E)
Mechanical
Final Mechanical/HVAC
RequiredTypical Final- System operational testCritical
Verify HVAC system starts, runs, and produces heated and cooled air
FBC-M 304.1 - Air handler and condenser installationCritical
Verify equipment is properly installed with required clearances and level
FBC-M 304.1 - Condensate drainCritical
Verify condensate drain is properly routed and terminated
FBC-M 307.2 - Duct registers and grilles
Verify all supply and return registers are installed and operational
FBC-M 601.2 - Equipment labels and data plates
Verify equipment nameplates match approved plans for capacity and efficiency
FBC-M 304.1