Single Family

Single Family Aluminum Structure with Shed

Aluminum carport or cover with an integrated shed as part of the same structure.

Last updated: Apr 20, 2026

Section 1

Required Documents

Submit these with your initial project package.

Always required

  • Construction Plans Sealed by a Florida Registered Design Professional
    Construction plans sealed by a Florida-registered design professional showing layout/framing plus wind load criteria and anchor method.
  • Product Approvals
    Florida Product Approvals for structural components.
  • Site Plan / Survey
    Site plan or survey showing property boundaries, setbacks, and structure footprint.

Section 2

Plan Review Criteria

What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.

Plan review scope for this project type isn't published yet. Call FCC at (772) 222-6679 and we'll walk you through it.

Section 3

Inspection Walkthrough

Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.

Building

Phase #1

Rough Framing

Required
  1. Wall framing and stud spacingCritical

    Verify wall stud size, spacing, and layout match approved plans for the shed portion

    FBC-R R602.3FBC-R R602.3.1
  2. Header and beam sizingCritical

    Verify headers over openings and beams match approved plans

    FBC-R R602.7
  3. Top and bottom plate connectionsCritical

    Verify top plates are doubled and bottom plates are properly anchored

    FBC-R R602.3.2
  4. Roof framing and rafter/truss connectionsCritical

    Verify roof framing members are properly sized, spaced, and connected per plans

    FBC-R R802.3FBC-R R802.10
  5. Shed to aluminum structure connectionCritical

    Verify the attachment between the framed shed and the aluminum carport structure per engineering

    FBC-B 2002.1
  6. Hurricane straps and tie-downsCritical

    Verify hurricane straps or tie-downs are installed at roof-to-wall connections per plans

    FBC-R R802.11
  7. Sheathing attachment

    Verify wall and roof sheathing is properly nailed per schedule

    FBC-R R602.3FBC-R R803.2
Phase #2

Final Building

RequiredTypical Final
  1. Base rail attachment and tapcon spacingCritical

    Verify base rail is secured with tapcons at correct spacing per plans

    FBC-B 2002.1FBC-B 2002.4
  2. Post to base connectionCritical

    Verify structural connection of posts to base rail

    FBC-B 2002.1
  3. Post to roof beam connectionCritical

    Verify structural connection of posts to roof beams

    FBC-B 2002.1
  4. Gusset connectionsCritical

    Verify gusset plates are installed at structural joints per plans

    FBC-B 2002.1FBC-B 2002.4
  5. Beam to gutter connectionCritical

    Verify beams are properly connected to gutter system

    FBC-B 2002.1
  6. Gutter clips

    Verify gutter clips are installed at proper intervals

    FBC-B 2002.1
  7. Overall structureCritical

    Verify overall shape and construction matches approved plans

    FBC-B 2002.4
  8. Screen door opening mechanism height

    Verify door latch/opening mechanism is at 54 inch height where pool barrier applies

    NEC 680.26FBC-R R303
  9. Pool equipment bonding

    If pool equipment is present, verify bonding wire at pool equipment and at structure

    NEC 680.26
  10. Elite roof panel sealing

    If elite (solid) roof panels are present, verify sealing is complete

    FBC-B 2002.5