- #01Design wind speed & exposureLife Safety
Structural drawings must declare design wind speed (Vult) and exposure category matching the jurisdiction's wind speed map.
FBC-R R301.2.1ASCE 7-22 - #02Footing / foundation designLife Safety
Footing or foundation design must show dimensions, reinforcement, depth, and connection to the structure above.
FBC-R R403FBC-B 1809 - #03Florida product approvalCode
Florida product approval (FL#) or Miami-Dade NOA must be listed for regulated products (fenestration, structural panels, covering systems).
FBC-B 1708FBC-R R301.2.1.2 - #04Plan review applicability (FBC 107.3.5 minimum criteria)Documentation
Aluminum screen enclosures are not in FBC-B 107.3.5 minimum criteria for 1&2 family (FBC-B Ch. 20). Footing component does require review. FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5 - #05Engineer of record sealDocumentation
Structural drawings must bear a current Florida-licensed engineer's seal and signature.
Florida Statutes Chapter 471FBC-B 107.3.5
Single Family Aluminum w/ New Footing
Screen enclosures, pool cages, carports, aluminum pergolas including new footing construction
Last updated: Apr 20, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Construction Plans Sealed by a Florida Registered Design ProfessionalConstruction plans sealed by a Florida-registered design professional showing aluminum structure layout and framing, including footing and foundation engineering details.
- Site Plan / SurveySite plan or survey showing property boundaries, setbacks, and structure footprint.
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingAdvisory
Items marked Advisory are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Building
Footing, Slab, UFER
Required- Footing dimensionsCritical
Verify footing depth and width match approved plans
FBC-R R403.1FBC-R R403.1.1 - Rebar size and placementCritical
Verify rebar size, spacing, and placement per approved plans
FBC-R R403.1 - Footing layout and alignment
Verify footing layout matches approved site plan dimensions
FBC-B 110.3 - Clean and debris-free excavation
Confirm excavation is free of standing water, loose soil, and debris before pour
FBC-R R403.1
Final Building
RequiredTypical Final- Base rail attachment and tapcon spacingCritical
Verify base rail is secured with tapcons at correct spacing per plans
FBC-B 2002.1FBC-B 2002.4 - Post to base connectionCritical
Verify structural connection of posts to base rail
FBC-B 2002.1 - Post to roof beam connectionCritical
Verify structural connection of posts to roof beams
FBC-B 2002.1 - Gusset connectionsCritical
Verify gusset plates are installed at structural joints per plans
FBC-B 2002.1FBC-B 2002.4 - Beam to gutter connectionCritical
Verify beams are properly connected to gutter system
FBC-B 2002.1 - Gutter clips
Verify gutter clips are installed at proper intervals
FBC-B 2002.1 - Overall structureCritical
Verify overall shape and construction matches approved plans
FBC-B 2002.4 - Screen door opening mechanism height
Verify door latch/opening mechanism is at 54 inch height where pool barrier applies
NEC 680.26FBC-R R303 - Pool equipment bonding
If pool equipment is present, verify bonding wire at pool equipment and at structure
NEC 680.26 - Elite roof panel sealing
If elite (solid) roof panels are present, verify sealing is complete
FBC-B 2002.5