- #01Footing / foundation designLife Safety
Footing or foundation design must show dimensions, reinforcement, depth, and connection to the structure above.
FBC-R R403FBC-B 1809 - #02Attachment to existing structureLife Safety
Connection details between the new work and the existing structure must show fastener type, spacing, and embedment.
FBC-B 2002.5FBC-R R301.1 - #03Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, replacing a manufactured home involves foundations and tie-downs (Exemption #6 carveout). FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
Single Family Mobile Home Replacement
Last updated: Apr 21, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Site Plan / Survey
- Tie-Down Engineering / Manufacturer Install Manual
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingAdvisory
MechanicalAdvisory
- #01Combustion air and ventingLife Safety
Fuel-fired equipment requires combustion air and proper venting per FBC-M 303 / 804.
FBC-M 303FBC-M 804FBC-FG - #02Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, site-built mechanical connections only. FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
ElectricalAdvisory
- #01Service size and load calculationCode
Electrical service and feeder sizing supported by NEC Article 220 load calculation.
NEC 220NEC 230 - #02Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, service connections are the scope. FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
Items marked Advisory are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Building
Tie Down
Required- Anchor and strap installationCritical
Verify ground anchors and tie-down straps are installed per manufacturer specs and engineering
FBC-R R301.2.1FBC-B 3103.1 - Anchor spacing and countCritical
Verify number and spacing of anchors match tie-down engineering
FBC-R R301.2.1 - Strap tension and connectionCritical
Verify straps are properly tensioned and connected to frame rails
FBC-R R301.2.1 - Pier and pad conditionCritical
Verify piers and pads are properly placed and level under home
FBC-R R301.2.1
Final Building
RequiredTypical Final- Egress doors and hardwareCritical
Verify egress doors provide minimum 32-inch clear width and proper hardware
FBC-R R311.2 - Smoke alarms installed and operationalCritical
Verify smoke alarms in each bedroom, outside sleeping areas, and each level
FBC-R R314.3 - CO alarms installedCritical
Verify carbon monoxide alarms where required
FBC-R R315 - Emergency escape openingsCritical
Verify bedroom windows meet egress size requirements
FBC-R R310.1 - Stairway complianceCritical
Verify stair rise, run, handrail height, and landing dimensions
FBC-R R311.7 - Address numbers visible
Verify address numbers are posted and visible from street
FBC-R R319.1 - Exterior finishes complete
Verify exterior cladding, trim, and weatherproofing are complete
FBC-R R703.1 - Site grading and drainage
Verify finish grade slopes away from foundation minimum 6 inches in 10 feet
FBC-R R401.3
Electrical
Final Electrical
RequiredTypical Final- Panel complete and labeledCritical
Verify panel cover installed, all breakers labeled, no open knockouts
NEC 408.4 - GFCI and AFCI operationalCritical
Verify all GFCI and AFCI devices test and reset properly
NEC 210.8NEC 210.12 - Receptacle and switch functionCritical
Verify outlets and switches operate correctly throughout
NEC 210.52 - Light fixtures installed
Verify all light fixtures are installed and operational
NEC 210.70 - Exterior lighting and outletsCritical
Verify exterior outlets are GFCI protected and lighting is functional
NEC 210.8NEC 210.52(E)
Mechanical
Final Mechanical/HVAC
RequiredTypical Final- System operational testCritical
Verify HVAC system starts, runs, and produces heated and cooled air
FBC-M 304.1 - Air handler and condenser installationCritical
Verify equipment is properly installed with required clearances and level
FBC-M 304.1 - Condensate drainCritical
Verify condensate drain is properly routed and terminated
FBC-M 307.2 - Duct registers and grilles
Verify all supply and return registers are installed and operational
FBC-M 601.2 - Equipment labels and data plates
Verify equipment nameplates match approved plans for capacity and efficiency
FBC-M 304.1