- #01Deck attachment scheduleLife Safety
Roof deck (sheathing) fastener schedule must be shown or referenced, particularly when re-nailing is required by the jurisdiction.
FBC-R R803FBC-B 2304.10FBC-EB 706 - #02Secondary water barrier (HVHZ / jurisdiction requirement)Life Safety
Verify secondary water barrier is specified when required by the jurisdiction or when applying HVHZ provisions.
FBC-B 1503.9FBC-R R905.1.2 - #03Florida product approval for roof coveringCode
Verify Florida product approval (FL#) or Miami-Dade NOA is listed for the new roof covering, matching the project's wind zone.
FBC-B 1504FBC-B 1708FBC-R R905 - #04Underlayment specificationCode
Underlayment type and layers must be specified consistent with the roof covering and jurisdictional wind speed.
FBC-R R905.1.1FBC-B 1507 - #05Plan review applicability (FBC 107.3.5 exemption)Documentation
Per FBC-B 107.3.5, plan review is not required for re-roofs. FCC performs this review only when the building department requires plan review or the client opts in. Product approvals and installation requirements are typically verified at inspection.
FBC-B 107.3.5
Single Family Re-Roof
Last updated: Apr 20, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Product ApprovalsFlorida Product Approvals for underlayment and roofing materials (shingles, tile, metal, etc.)
- Roof Report (Roofr, EagleView, etc.)Roof measurement report from Roofr, EagleView, or similar satellite-based roof reporting system showing dimensions, slopes, and area calculations.
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingAdvisory
Items marked Advisory are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Building
Roof Dry In, In Progress
Required- Underlayment installationCritical
Verify roof underlayment type and installation per code and manufacturer specs
FBC-R R905.1.1 - Drip edge installationCritical
Verify drip edge is installed at eaves and rakes
FBC-R R905.2.8.5 - Valley and flashingCritical
Verify valley flashing and wall flashing are properly installed
FBC-R R903.2 - Roof penetration sealing
Verify all roof penetrations are properly sealed and flashed
FBC-R R903.2 - Deck conditionCritical
Verify roof deck is in acceptable condition and any damaged sheathing has been replaced
FBC-R R803.1
Roof Final
RequiredTypical Final- Roofing material installationCritical
Verify roofing material is installed per manufacturer specs and approved plans
FBC-R R905.2 - Flashing completenessCritical
Verify all flashing is complete at walls, valleys, penetrations, and edges
FBC-R R903.2 - Ridge vent or ventilation
Verify roof ventilation is installed per plans
FBC-R R806.1 - Nailing pattern complianceCritical
Verify roofing material nailing pattern meets high-wind requirements
FBC-R R905.2 - Cleanup and debris removal
Verify job site is clean with no exposed nails or debris in gutters
FBC-B 110.3