- #01Structural attachment and upliftLife Safety
Racking system attachment to roof structure must be designed for wind uplift at the project wind zone; fastener embedment and spacing per engineering.
FBC-B 1607.13FBC-R R301ASCE 7-22 - #02Roof structural capacity verificationLife Safety
Existing roof structure (rafters or trusses) must be evaluated for the added solar dead load plus wind uplift.
FBC-B 1603FBC-EB Ch. 4 - #03Fire access setbacks and pathwaysLife Safety
Roof solar installations must preserve firefighter access pathways and ridge setbacks per FBC-R / NFPA.
FBC-R R324.4FBC-B 1205.2.2NFPA 1 - #04Flashing and roof penetration detailPerformance
Flashing detail at each roof penetration (lag/standoff) must match roof covering type and manufacturer product approval.
FBC-R R905Product approval for flashing kit
Single Family Solar
Last updated: Apr 20, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Construction Plans Sealed by a Florida Registered Design ProfessionalSolar installation plans including structural attachment details, equipment specifications, and electrical diagrams. Must include product/equipment specs.
- Site SurveySite survey or plan showing solar panel layout, roof orientation, and property boundaries
Section 2
Plan Review Criteria
What FCC's plans examiner looks for on this project type, by trade. Items are grouped by priority — life-safety first. Building department checks may go further; this is the FCC private provider scope under FL Statute 553.791.
BuildingRequired
ElectricalRequired
- #01PV system disconnectLife Safety
Accessible disconnecting means for the PV system per NEC 690.13, typically at or near the service equipment.
NEC 690.13 - #02Rapid shutdownLife Safety
Rapid shutdown system per NEC 690.12 for rooftop PV installations.
NEC 690.12 - #03Grounding and bondingLife Safety
PV system grounding, equipment bonding, and grounding electrode conductor per NEC 690.41-.50.
NEC 690.41NEC 690.43NEC 690.47 - #04Conductor sizing, overcurrent, and interconnectionCode
DC and AC conductor sizing, overcurrent protection, and utility interconnection per NEC 690/705.
NEC 690.8NEC 690.9NEC 705.12
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Electrical
Rough Electrical
Required- Mounting and racking systemCritical
Verify solar panel mounting and racking system is installed per engineered plans with proper roof attachment
FBC-B 1603.1FBC-R R324.4 - Electrical conduit and wiringCritical
Verify conduit routing, wire sizing, and connections per approved plans and NEC
NEC 690.31NEC 690.8 - Grounding and bondingCritical
Verify equipment grounding conductor and bonding of all metallic racking components
NEC 690.43NEC 690.47 - Rapid shutdown complianceCritical
Verify rapid shutdown system is installed and labeled per NEC
NEC 690.12 - Roof penetration waterproofingCritical
Verify all roof penetrations are properly flashed and sealed
FBC-R R903.2
Final Electrical
RequiredTypical Final- Panel installation and layoutCritical
Verify solar panel layout matches approved plans and all panels are secured
FBC-R R324.4 - Inverter installationCritical
Verify inverter is properly installed with required clearances and labeling
NEC 690.8NEC 705.12 - Disconnect and labelingCritical
Verify AC and DC disconnects are installed, accessible, and properly labeled
NEC 690.13NEC 690.56 - System operational test
Verify system powers on and produces expected output
NEC 690.1